Michael's Landscapes

Landscaping Company - Tamassee, SC

Average rating

info

4.80

4.8

based on 15 online reviews

Average rating

info

4.80

4.8

based on 15 online reviews
based on 15 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Front Yard Renovation

Jan 2014

Remove existing grass and weeds, spread topsoil, install 200' steel edging, lay 4000 sq. ft. Centipede Sod

$9k

Seneca, SC

Landscape New Home

Nov 2013

Total landscape installation for a new Lake Keowee home. Finish grading, install river rock drainage swale. Installed a beach sand badminton court with treated lumber edging. Install sprinkler system, trees and shrubs, landscape boulders, 80 yards Hardwood Mulch. Installed temporary seeded lawn to be replaced with sod in Spring

$20k

Seneca, SC

Landscape Home Addition

Nov 2013

Grade to provide improved surface drainage, haul away excess dirt, spread 20 cu. yds. Hardwood mulch.

$2k

Seneca, SC

Lawn Renovation

Sep 2013

Remove existing grass, spread topsoil, install 5000 sq. ft. Palisades Zoysia sod

$7k

Seneca, SC

Back Yard Renovation

Sep 2013

Complete renovation of a neglected back yard. Removed weeds and scrub vegetation, installed landscape block accent walls, 6x6 steps with pavers, 200' River Rock pathway with steel edging. Spread 40 cu. yds. Hardwood mulch

$11k

Pendleton, SC

Landscape Renovation

Sep 2013

Regrade, remove old railroad ties, remove overgrown plants, spread topsoil and install Centipede Sod, install River Rock drainage swale, spread Hardwood mulch

$5k

Townville, SC

New Home Landscape

Sep 2013

Total landscape installation on a new home: finish grading, drainage work, spread topsoil, install trees and shrubs,install sprinkler system, install hardwood mulch, install 8000 sq. ft. Palisades Zoysia sod.

$17k

Seneca, SC

New landscape

Sep 2013

Landscape for a new home - finish grading, place landscape boulders, install trees and shrubs, spread hardwood mulch

$8k

Westminster, SC

Retaining Wall

Jul 2013

Removed an old, rotten Railroad tie wall. Installed a segmented block wall using Everloc block. Wall 120' long, 4' tall.

$14k

Salem, SC