W Contracting

General Contractor - Lumberton, NC

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Robeson County Transport

Nov 2016

Sawcut and Demo existing Asphalt Paving above Storm Drain. Remove existing Concrete basin and existing 56lf of 18" RCP Pipe, Backfill trench w/ 2" of compacted base and ensure proper grade. Lay 60lf of 18" RCP Pipe and Install Concrete catch Basin in middle of new Pipe. Backfill trench and patch asphalt

$6k

Lumberton, NC

Public Storm Drain Services

Aug 2016

Installed 120lf of 18" RCP Pipe, 137lf of 24" RCP Pipe, 3 concrete frame and grate basins and raised an existing manhole

$43k

Lumberton, NC

Haul in 40yds Topsoil and Grade yard

Jun 2016

Once we finished removing the pines and grinding the stumps of phase one. We hauled in close to 40 yards of topsoil, removed any existing Hardscape structures in yard, and Graded front and back yard

$1.3b

Goldsboro, NC

Driveway w/ additional parking and drainage

Jun 2016

Demolition existing Driveway/Sidewalk, excavate area for additional parking, Install 2 Traffic Rated Catch Basins and tie into existing drain pipe, Pour new Concrete Driveway, sidewalk, and parking area

$15k

Goldsboro, NC