J & J Resnick Paint and Paper Hanging

Painting Company - Littleton, MA

Average rating

info

4.74

4.7

based on 10 online reviews

Average rating

info

4.74

4.7

based on 10 online reviews
based on 10 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Replaced Ceiling Sheetrock

May 2014

REPLACE SHEET ROCK CEILING, TREAT FOR MOLD, RE-HANG NEW SHEET ROCK, TAPE AND MUD, PAINT TOTAL INCLUDES MATERIALS AND LABOR

$985

Lowell, MA

Townsend Exterior

May 2014

Installed five sets of shutters (includes materials).

$475

Townsend, MA

Townsend Bathroom

May 2014

Removed the old tub and installed a new tub. Painted the trim around the bathroom window.

$2k

Townsend, MA

Fireplace Mantle

May 2014

FIREPLACE MANTLE, TOTAL INCLUDES ALL MATERIALS AND LABOR, UNLESS OTHERWISE NOTED

$395

Townsend, MA

Window Painting

May 2014

PAINTED 4 WINDOWS TOTAL INCLUDES ALL MATERIALS AND LABOR, UNLESS OTHERWISE NOTED

$825

Windham, ME

Ceiling and Insulation

May 2014

CEILINGS, TAPE, MUD, SWIRL/TROWEL HANG INSULATION LABOR ONLY

$985

Bolton, MA

Closet and Bathroom Maintenance

Apr 2014

2ND FLOOR BATHROOM, SKIM COAT CEILING, BUILD SHOWER PAN AND STALL, TILE SHOWER FLOOR AND WALLS, (CUSTOMER WILL SUPPLY TILE FOR SHOWER WALLS AND FLOOR) INSTALL SHOWER SHELVES AND SAFETY RAILS TILE BATHROOM FLOOR (SHOWER DOOR NEEDS TO BE CHOSEN, INSTALL PRICE TO BE DETERMINED AFTER DOOR IS CHOSEN) (NEED GROUT COLOR FOR THE 2ND FLOOR BATH) MASTER CLOSET INSTALL SHELVES AND PAINT, INSTALL CLOTHES RAIL 1ST FLOOR BATH, REMOVE SHOWER AND FLOOR TILE TILE SHOWER (TILE SUPPLIED BY CUSTOMER) TILE BATHROOM FLOOR (TILE SUPPLIED BY CUSTOMER) INSTALL SHOWER SHELVES AND SAFETY RAILS (NEED A GROUT COLOR FOR THE FIRST FLOOR BATH) TOTAL INCLUDES ALL MATERIALS AND LABOR EXCEPT WHERE NOTED

$12k

Townsend, MA

Baseboard Remodel

Apr 2014

BASEBOARD, REMOVE MASTER BEDROOM, GUY ROOM, 2ND BATH, 1ST BATH INSTALL AND APPLY CLEAR COAT, BASEBOARD AND DUST CAP, MASTER BEDROOM, MASTER CLOSET, 2ND FLOOR BATH, 1ST FLOOR BATH AND GUY ROOM

$3k

Townsend, MA

Baseboard Remodel

Apr 2014

ENTRANCE FRONT AND BACK BATH, FIRST AND SECOND FLOOR LINEN CLOSET, FIRST AND SECOND FLOOR BASEMENT INTERIOR GUY ROOM 2 BED ROOMS ON 2ND FLOOR CLOSET 1ST FLOOR BY ROOM AND MASTER REMOVES DOORS AND TRIM INSTALL NEW DOORS AND TRIM INCLUDING HANDLES AND LOCKS CLEAR COAT APPLIED TO OAK DOORS INSTALL STORM DOOR IN FRONT ENTRANCE CLOSET DOOR FOR GUEST ROOM, (STORE IN BASEMENT) TOTAL INCLUDES ALL MATERIALS AND LABOR, UNLESS OTHERWISE NOTED

$12k

Townsend, MA