Lulusheka Construction

Flooring Contractor - Whittier, CA

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Oak Park home. Phase 1

Mar 2016

On this project we acid washed the concrete, fixed the existing concrete, fixed cracks and broken pieces, poured a skim coat of acrylic cement, hand troweled the stones, and sealed the entire surface. Walkway is now extremely tough, beautiful vibrant colors for years to come, non porous so it doesn't absorb stains, mold and mildew resistant, heat and cold resistant, chemically bonded to concrete so it won't come off, and a ten year warranty! The customer is so happy we are doing the driveway as well.

$5k

Oak Park, CA

Faucet Install

Jul 2013

Water-filtration machine was sold independently. Created a custom integrated faucet so it all worked together.

$300

Whittier, CA

Dry Wall Repair

Apr 2013

Holes, small chips.

$200

La Habra Heights, CA

Cabinet Installation

Mar 2013

Installed cabinet and entertainment center. Wired for electricity and lighting, speakers. Custom made solid maple for counter-tops. Cabinet material not included in price. About 800 for labor.

$4k

La Habra Heights, CA

Custom Mirror

Jan 2013

Custom reuse of a mirror. Restored for a beautiful and large look.

$800

Whittier, CA

Bathroom re-tile

Nov 2012

Small bathroom re-tile. Price included material and labor, including sliding door.

$700

La Habra Heights, CA