Rooster Remodels

Remodeling Contractor - Port Orchard, WA

Average rating

info

4.57

4.6

based on 18 online reviews

Average rating

info

4.57

4.6

based on 18 online reviews
based on 18 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

McCubbins

Sep 2014

Full Remodel: Kitchen: Demo cabinet for new microwave/hood vented to exterior Demo cabinet for new slide in range Demo oven cabinet for new furniture piece at the nook. Finish drywall @ kitchen nook Move electrical at nook Add electrical @ nook Add extra light at nook Add electrical for microwave/hood Cap electrical @ double oven in attic/crawl. Remove all trim. Remove flooring. Install new 6 prefinished Cannon Beach Solid 3 1/2 by 3/4 Country wood floor. 16 by 12. Reinstall trim. Prep for paint. Demo existing counters for new countertops. Install new counters. Fabricate & install 3cm Pental Quartz Coastal Grey in kitchen - no splash 1 Undermount sink cutout & installation Large radius Eased edge Kitchen backsplash. Pental Metal Tech Grigio Satin. Muretto 12 by 21 sheets. Note sure yet what client would prefer on how to finish the exposed edges on backsplash Install sink provided. Install faucet provided. 30 range to be installed. (provided by customer) 3 fillers on left and right for range. 1 on left and right for micro/hood. **SAVE ALL PULLS. Remove dont reinstall. Laundry: Remove all trim Remove underlayment Install new 1/2 plywood underlayment. Install new vinyl tile floor. Armstrong alterna mesa stone light gray 16 by 16 Reinstall trim. Prep for paint Client is aware the transition may be set at different heights. Client is aware the cut tiles may look different. Living/dining room: Remove all trim. Remove flooring. Install new 6 prefinished Cannon Beach Solid 3 1/2 by 3/4 Country wood floor. 16 by 30. Reinstall trim. Prep for paint. Thresholds are between living room and family room. not dining room Entry: Demo drywall connecting posts Mud/tape finish drywall Remove all trim. Remove flooring. Add 1 plug @ entry Remove 2 ceiling sconces @ entry Add 1 chandelier @ entry Add hall closet Install new 18 by 18 tiles on point with a 6 border. Size of the border tile in the entry changes to 6"x18" cut from 18"x18" Pental Focus grafite field tiles. Field tiles cut down from 18 by 36 to 18 by 18. Tile floor. On point. Grout/clean/seal. Marvel Field Matte 2 Calacatta 8 by 15. Reinstall trim. Prep for paint **Note from client. The size of the border tile in the entry changes to 6"x18" cut from 18"x18" Pental Focus grafite field tiles. Threshold at din room and entry to be width of baseboard if possible. No threshold at hall and entry, border adjacent to wood. The entry floor tiles remain the same 18"x18" tiles on point cut from 18"x36" Pental Marvel Calacatta extra. Chrome wide strip btw border and tile 12 threshold. 2-6 inch pieces. Client is aware the transition may be set at different heights. Client is aware the cut tiles may look different. Built-ins and fireplace mantel: Gas valve to be cut into side of cabinet (*plans show 48 to top of hearth. We think this is to close for wood) Demo existing TV area Reframe for new TV area. Flush drywall not recessed. Move electrical as needed Add plug for TV Add specialty cabling. HDMI run to built-in. Drywall. Mud/tape texture Trim accent to frame new TV (As noted below, other contractor for customer will come in behind us and install cabinets provided) Mount TV provided. (Customer supplies TV and bracket) Contractor to connect all electronics and guide customer on purchase Guest bedroom: Demo existing cabinets/doors/counters Reframe for new design Drywall. Mount TV provided. Customer supplies TV and bracket. Contractor to connect all electronics and guide customer on purchase Mud/finish Add trim throughout as needed. MDF. (As noted below, other contractor for customer will come in behind us and install cabinets provided) Remove all trim. Remove flooring, New carpet and pad Captivating London Fog. To be determined. 11 by 13. 3 by 5 Reinstall trim. Prep for paint. Master bedroom: Remove all trim. Remove flooring. New carpet and pad Captivating London Fog. 13 by 19. Reinstall trim. Prep for paint. New carpet and pad in closet. Captivating London Fog. To be determined. Plan issue for Master Bathroom: **Large beam in new doorway into bathroom from bedroom needs to be redone. Temp support house Pour new concrete pad in crawl space Open floor and install new post to go through floor into attic and in the wall. Install new beam Remove temp supports Master Bathroom: Demo all walls and drywall. Demo all flooring. Demo cabinetry. Reframe new walls/entry doors/pocket doors according to plans. Frame in new pony wall to the right of new vanity. Frame in new full wall across from pony wall. Drywall on the exterior of shower Move electrical as needed Move both shower can lights Move plumbing as needed. Toilet to be on bathroom wall. Drywall. Mud/tape/finish Install new shower faucet. Install new hand held faucet. Install new rain head with option valve. Install new custom shower pan. Tar paper, slightly slopped mortar bed, red guard, rubber liner, red guard, slightly slopped mortar bed, red guard. Tile using 1.25 by 1.25 Marvel Matte Mosaico Calacatta extra tile. Grout using epoxy grout. Install 1/2 hardibacker on shower walls. Mud seams. Red guard. Tile using 12 by 24 Marvel Field Matte 2 Calacatta extra tiles. (cut to 12 by 12) Brick set. Grout walls lower section epoxy, standard grout above the 1 mark. Eye band on shower wall. 2 large recessed tile shelves. Tile new bench seat Install grab bar to attach shower wand Install new bath fan. Ultra quiet. Shower drain/grate to be installed along shower door. Vanity (As noted below, other contractor for customer will come in behind us and install cabinets provided) Install heat mat for tile floor with programmable Thermostat Tile floor. On point. Grout/clean/seal. 12 by 12 Marvel Field Matte 2 Calacatta Bullnose will be Marvel Lappato Battiscopa 2-2 by 23 Calacatta Install tiles around tub. Approx. 42 high for a splash guard. Tile using 12 by 24 Marvel Field Matte 2 Calacatta extra tiles. (cut to 12 by 12) Brick set. Install tub and faucet provided by customer (As noted below, other contractor for customer will come in behind us and install cabinets provided) Fabricate & install Pental Quartz Lattice in master bath - includes 4" splash Undermount sink cutouts & installation 1 - Ogee edge. Contractor has contacted installers about backsplash sides to be finished with a curved edge. **No tile base trim. All trim to be wood to match the rest of the house. Client is aware the transition may be set at different heights. Client is aware the cut tiles may look different. Whole interior paint: Examine all trim for dings. Fill w/ spackle. Sand. Recaulk all trim work. Prime all trim work to check for dings and ensure adhesion. Examine all trim for dings. Fill w/ spackle. Sand. Spray top coat. Color matched to cabinets in kitchen. Walls up to 4 colors. Client to select. Parker Paint. Ceilings flat white. Parker paint. Paint garage one color. Parker Paint. Kitchen Cabinets: Remove all doors/drawers and set up paint booth. (plastic curtains and drops) Prep kitchen for painting. Spray doors/drawers/boxes. 1. Sand all surfaces, clean. 2. Prime all surfaces. 3. check for dings/fill. 4. Prime all surfaces. Sand/clean 5. Spray all doors/drawers and boxes with an oil based fine millwork paint. (not painting inside the boxes, just the faces. Touchup paint. Install doors/drawers. New knobs/pulls. (client to provide all knobs/pulls) Misc: Remove all ceiling fans. Drywall. Mud/tape/finish Replace all light bulbs Remove all cornices. Mud/finish. Remove all hearth tile. Reinstall with new. Hearth tile in living room to match entry border matte grafite Remove all phone jacks in the home. Drywall. Mud/tape/finish Move thermostat Drywall repairs: Smooth finish all existing drywall.

Gig Harbor, WA

Dowd

Jul 2014

Remove existing siding Frame in garage door and window Install new 32 steel door Reside with T-111. Caulk. Tear off roofing and sheath entire roof Roof with 30 year laminate shingle Install new larger fascia Paint

Ruston, WA

Salon

Mar 2012

Full Remodel

Gig Harbor, WA