Turn Key Remodeler

Handyman - Phoenix, AZ

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Steel frame garage

Sep 2012

All design and permits; foundation and complete build.

$43k

Pasco, WA

Capitol Hill Condo Bathroom Remodel

Jun 2012

demo all existing bathroom pieces; moved hot water heater out of bathroom closet and added instahot water heater. Installed heated floor and porcelain tiles; installed walk-in shower; redesigned and relocated sink, tub and toilet. Added new electrical for heated floor and instahot.

$8k

Seattle, WA