J.PelkeyConstruction

Kitchen & Bath Remodeler - Mesquite, TX

5.0

4 reviews

5.0

4 reviews

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Complete bath remodel

Feb 2019

Complete demo of existing vanity, bathtub, shower walls, fir down, toilet, flooring, mirror, lighting and exhaust fan. Sheetrock replaced as needed, tape bed texture primer and paint. Installation of new bathtub, backer board, wall tile, floor tile, vanity, mirror, lighting and exhaust fan.

$7k

Mesquite, TX

Bathtub and tile replacement

Dec 2018

Demo of existing fiberglass tub shower, and shower valve. Installed new shower valve, reframed as needed, installation added. Installation of new shower valve, bathtub, backer board, wall tile and shower rod.

$3k

Mesquite, TX

Complete bath remodel

Oct 2018

Demo complete bathtub, toilet, vanity, mirror, lighting, wallpaper, and flooring. Installation of new shower pan, shower valve, wall tile, floor tile, wall texture primer and paint, vanity, toilet, mirror and lighting. Frameless shower door installed and grab bars.

$7k

Mesquite, TX

Complete bath remodel

Aug 2018

Demo existing tub,tile, flooring, vanity, toilet, mirror, lighting and window. Repaired sub floor as needed. Installation of new flooring, shower pan, shower valve, reframing as needed, backer board, tile, vanity, toilet, mirror and lighting. Texture primer and paint.

$7k

Mesquite, TX

bath remodel

Nov 2015

Demo existing bathtub and tile, installed new shower pan & new shower valve. Installed niche and hardi backer board, tile, foot shelf, tub grab bar and new shower doors. Customer's only bath, needed to be completed in 3 days! As demo started, we discovered the dryer vent running behind tub base, to be 100% clogged back to dryer. Timing was right to correct this problem.

$3k

Garland, TX

Cedar Hill Hardwood Installation

Oct 2015

Moved all furniture and protected as needed. Demo of existing engineered wood flooring, clean up and haul off debris. Prep flooring as needed and installed 3/4 hardwood nail down. Completed all baseboard and shoe moulding including paint and staining. Cleaned and moved furniture back in place.

$4k

Dallas, TX

Bath Remodel

Sep 2015

Demo existing tub, tile, vanity, toilet, and flooring. Installed all new bathtub, shower valve, hardi backer board, and tile floors and walls. Painted complete ceiling and walls. Completed installation of vanity, toilet, mirror and bath accessories

$5k

University Park, TX

bath remodel

Jun 2015

Complete demo of bathtub, toilet, vanity, all wall and floor tile, cleanup and prep. Installed new tub and shower valve .Hardi backer on all walls and floors, completed necessary repairs, texture and painted. Completed tile installation on walls and floors and installed new toilet, vanity, faucet and plumbing. Finished out bath hardware and clean-up

$6k

University Park, TX

Custom Stonework

Mar 2016

0

McKinney, TX